Mile End Road


Inadequate re-design of Mile End Junction back pedals to the drawing board

As part of Boris Johnson’s new vision for cycling (PDF download) the inadequate re-design of Mile End Junction has been sent back to the drawing board. There will be new plans, and very probably, a new consultation, so we now have a chance to get this dangerous junction properly re-designed for the needs […]


Victoria Park BT Live event and crowd control at Mile End

On Thursday 26th April MERA went to the Licensing Committee along with other objectors – including Cllr Joshua Peck and Cllr Marc Francis to register our concerns about the proposed use of Victoria Park for the BT London Live events connected to the Olympic Games and the implications for Mile […]